{"ai_json_enabled":true,"answer":"Timing varies by site and scope. The site assessment involves discussing the requirement, visiting the site where needed, and recording the existing infrastructure so Pacific can base the proposal on actual work rather than assumptions. After the assessment, Pacific normally prepares a practical scope and proposal describing the recommended solution, the proposed scope, and any lead times or scheduling considerations. Because pricing, availability, specifications, and support arrangements can change, final details should be confirmed directly with Pacific Telephone & Data after the survey.","answer_source":"approved_parent_and_related_qas","category":"Technology Site Surveys and Accurate Quoting","category_slug":"technology-site-surveys-and-accurate-quoting","created_at":"2026-09-11T19:41:16+00:00","daily_publish_cap":2,"date_published":"2026-09-11","display_date":"2026-09-11","drip_batch":"daily_conversation_breadcrumb","drip_status":"published_topup","id":"conv-daily-20260911-2c344d98","image_ids":["pacifictd_a97a36c7_004","pacifictd_b4e892f7_006","pacifictd_b4e892f7_007"],"image_url":"","last_updated":"2026-09-11T19:41:38+00:00","local_cache_status":"pending_airtable_sync","publish_status":"published","published":true,"published_at":"2026-09-11T19:41:16+00:00","question":"How long does the site assessment take and when will we get the proposal?","question_intent":"conversational_followup","rss_enabled":true,"rss_pub_date":"Fri, 11 Sep 2026 19:41:16 GMT","scheduled_for":"2026-09-11T19:41:16+00:00","schema_enabled":true,"site_key":"pacific-telephone-data","slug":"how-long-does-the-site-assessment-take-and-when-will-we-get-the-proposal","source":"daily_qa_drip_conversational_followup","source_queue_id":"","source_record_ids":[],"source_type":"daily_qa_drip_conversational_followup","source_urls":[],"status":"active","tags":["conversation follow-up","daily drip"],"updated_at":"2026-09-11T19:41:38+00:00"}
