{"ai_json_enabled":true,"answer":"You should receive test results showing cable performance and end-to-end connectivity, plus labeling at both ends of each run. Pacific will also provide project documentation appropriate to the cabling scope, such as installation notes, outlet and patch-panel maps, and as-built information. In short, you\u2019ll have evidence of the work and a clear handover package to support maintenance and future changes.","answer_source":"approved_parent_and_related_qas","category":"CAT6 and CAT6A Structured Cabling","category_slug":"cat6-and-cat6a-structured-cabling","created_at":"2026-10-31T19:37:32+00:00","daily_publish_cap":2,"date_published":"2026-10-31","display_date":"2026-10-31","drip_batch":"daily_conversation_breadcrumb","drip_status":"published_topup","id":"conv-daily-20261031-796d6947","image_ids":["pacifictd_a97a36c7_021","pacifictd_b4e892f7_032","pacifictd_b4e892f7_033"],"image_url":"","last_updated":"2026-10-31T19:38:01+00:00","local_cache_status":"pending_airtable_sync","publish_status":"published","published":true,"published_at":"2026-10-31T19:37:32+00:00","question":"What deliverables should I expect after a cabling project?","question_intent":"conversational_followup","rss_enabled":true,"rss_pub_date":"Sat, 31 Oct 2026 19:37:32 GMT","scheduled_for":"2026-10-31T19:37:32+00:00","schema_enabled":true,"site_key":"pacific-telephone-data","slug":"what-deliverables-should-i-expect-after-a-cabling-project","source":"daily_qa_drip_conversational_followup","source_queue_id":"","source_record_ids":[],"source_type":"daily_qa_drip_conversational_followup","source_urls":[],"status":"active","tags":["conversation follow-up","daily drip"],"updated_at":"2026-10-31T19:38:01+00:00"}