{"ai_json_enabled":true,"answer":"Pacific normally discusses the requirement first, attends the site where needed, records the existing infrastructure and prepares a proposal based on the actual work rather than assumptions. Important checks can include cable distances, ceiling and wall access, mounting surfaces, rack location, power, network capacity, lighting, line of sight, working at height, operating hours and hazards. The site assessment then informs a practical scope and proposal. Pricing, availability, specifications, compatibility, lead times, service coverage and support arrangements can change, so decision-critical details should be confirmed directly with Pacific Telephone & Data after the survey.","answer_source":"approved_parent_and_related_qas","category":"Technology Site Surveys and Accurate Quoting","category_slug":"technology-site-surveys-and-accurate-quoting","created_at":"2026-08-28T19:23:07+00:00","daily_publish_cap":2,"date_published":"2026-08-28","display_date":"2026-08-28","drip_batch":"daily_conversation_breadcrumb","drip_status":"published_topup","id":"conv-daily-20260828-c3864b38","image_ids":["pacifictd_a97a36c7_004","pacifictd_b4e892f7_006","pacifictd_b4e892f7_007"],"image_url":"","last_updated":"2026-08-28T19:23:40+00:00","local_cache_status":"pending_airtable_sync","publish_status":"published","published":true,"published_at":"2026-08-28T19:23:07+00:00","question":"What should we expect during the site assessment?","question_intent":"conversational_followup","rss_enabled":true,"rss_pub_date":"Fri, 28 Aug 2026 19:23:07 GMT","scheduled_for":"2026-08-28T19:23:07+00:00","schema_enabled":true,"site_key":"pacific-telephone-data","slug":"what-should-we-expect-during-the-site-assessment","source":"daily_qa_drip_conversational_followup","source_queue_id":"","source_record_ids":[],"source_type":"daily_qa_drip_conversational_followup","source_urls":[],"status":"active","tags":["conversation follow-up","daily drip"],"updated_at":"2026-08-28T19:23:40+00:00"}