{"ai_json_enabled":true,"answer":"Documentation is provided as part of the handover and training material relevant to the system that has been installed. It should reflect the agreed scope and include labels, test results, configuration details, equipment information, user instructions and the fault-reporting process. The specific items depend on the model and site configuration, so the correct guide should be confirmed with Pacific.","answer_source":"approved_parent_and_related_qas","category":"Installation Quality Testing and Handover","category_slug":"installation-quality-testing-and-handover","created_at":"2026-09-07T19:29:01+00:00","daily_publish_cap":2,"date_published":"2026-09-07","display_date":"2026-09-07","drip_batch":"daily_conversation_breadcrumb","drip_status":"published_topup","id":"conv-daily-20260907-337a5f94","image_ids":["pacifictd_a97a36c7_007","pacifictd_b4e892f7_012","pacifictd_b4e892f7_013"],"image_url":"","last_updated":"2026-09-07T19:29:33+00:00","local_cache_status":"pending_airtable_sync","publish_status":"published","published":true,"published_at":"2026-09-07T19:29:01+00:00","question":"When is the documentation package handed over after installation?","question_intent":"conversational_followup","rss_enabled":true,"rss_pub_date":"Mon, 07 Sep 2026 19:29:01 GMT","scheduled_for":"2026-09-07T19:29:01+00:00","schema_enabled":true,"site_key":"pacific-telephone-data","slug":"when-is-the-documentation-package-handed-over-after-installation","source":"daily_qa_drip_conversational_followup","source_queue_id":"","source_record_ids":[],"source_type":"daily_qa_drip_conversational_followup","source_urls":[],"status":"active","tags":["conversation follow-up","daily drip"],"updated_at":"2026-09-07T19:29:33+00:00"}
